velmarcertification

03 / APPROVAL

Approval

As Notified Body NB 1839, we provide the following approvals within our authorised scope for pressure equipment.

PROCEDURES

Procedure approval

For permanent joining.

  • Procedures for welding.
  • Procedures for other permanent joining within our authorised scope.
Request procedure approval
PERSONNEL

Personnel approval

For personnel carrying out permanent joining.

  • Personnel carrying out welding.
  • Personnel carrying out other permanent joining within our authorised scope.
Request personnel approval

In your enquiry, specify the joining method and whether you need procedure approval, personnel approval or both.

HOW WE WORK

We start with a conversation.
Then we make a plan.

  1. 01

    Understand your needs

    Your goal, current situation and the support you need.

  2. 02

    Agree the details

    Activities, scope, responsibilities, price and timeframe.

  3. 03

    Follow the plan

    We carry out the agreed steps and deliver the results.

GOOD TO KNOW

Before we
begin.

Which service do I need?

Choose conformity assessment for pressure equipment. For documentation, processes, internal audits and management system preparation, choose ISO consulting. For permanent joining procedures and personnel, choose Approval.

How are price and timeframe determined?

After an initial review of your enquiry. For equipment, its type and the applicable procedure matter. For consulting, we consider your activities, organisation size, existing system and the support required.

What should my first enquiry include?

Include your organisation, the service required, a short description of the task and your preferred timeframe. For ISO consulting, state the relevant standard and whether you already have an established or certified system.